Golden well records explained

Golden, Colorado Well Depth, Yield and Drilling Costs

Colorado Well FinderWells by countyJefferson County › Golden

Buying land or a house in Golden means looking beyond the permit label. Records within five miles show a wide range of well conditions: the median reported depth is 70 feet, while the middle half runs from 29 to 300 feet. Reported yields are generally useful, but the ground changes quickly between mountain locations, fractured bedrock and sedimentary formations.

This page uses Colorado DWR permit records for Golden and nearby areas including West Pleasant View, Applewood, East Pleasant View, Fairmount, Genesee and Idledale. Use the results to frame a site-specific drilling bid and to identify questions about water quality, septic design, access and the intended household use.

4,246wells in DWR permit records
70 ftmedian well depth
29–300 ftmiddle half of well depths
7.2 gpmmedian pump yield
60 ftmedian depth to water
2025newest permit on record

Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Golden. Not every permit reports every field; each statistic uses the wells that report it.

How deep are wells around Golden?

55% under 100 ft19% 100–300 ft16% 300–600 ft9% 600+ ft
Depth statisticFeet
25th percentile29
Median70
75th percentile300
90th percentile565
Deepest on record1,997
Aquifer named on permitsWells
unnamed / fractured-bedrock aquifer3,537
Denver168
Alluvial114

How much water do wells make near Golden?

3% under 1 gpm21% 1–5 gpm64% 5–15 gpm12% 15+ gpm
Yield statisticgpm
25th percentile5.0
Median7.2
75th percentile11.0
Median depth to water60 ft
Median water level by decadeDepth to water
1960s26 ft
1980s92 ft
2010s21 ft
2020s120 ft

Golden well depths change sharply by ground

Golden’s reported well depth is shallow by regional standards at the median: 70 feet. The middle half of reported wells falls between 29 and 300 feet, but the 90th percentile reaches 565 feet and the deepest record is 1,997 feet. That spread matters when you price a new well. A nearby shallow completion does not guarantee the same result on a lot across a drainage or against the foothills.

About 55% of reported wells are under 100 feet. Another 19% fall between 100 and 300 feet, 16% between 300 and 600 feet, and 9% exceed 600 feet. Permits identify unnamed or fractured-bedrock aquifers most often, with Denver and alluvial aquifers also recorded. Fractured rock can make depth and water production difficult to predict from surface location alone.

Most Golden wells report a workable yield

Among the wells that report a pump yield, the median is 7.2 gallons per minute. The middle half produces 5.0 to 11.0 gallons per minute, which is a useful range for ordinary household planning when the well, storage system and septic design are all appropriate.

Yield is not the same as a continuous guarantee. About 64% of reported wells fall between 5 and 15 gallons per minute, while 21% are between 1 and 5 gallons per minute. About 3% report under 1 gallon per minute, and 12% report more than 15 gallons per minute. Only 503 wells report a pump yield, so ask for the original well test rather than relying only on the neighborhood median.

Water levels vary across Golden’s mountain ground

The median reported static water level is 60 feet below the surface, with the middle half from 16 to 120 feet. That range affects pump setting, trenching and the amount of lift a system must handle. It also shows why a water level from one property should not be treated as a measurement for the next lot.

The decade series does not show a simple, steady decline. Median depth to water was 26 feet in the 1960s, 92 feet in the 1980s, 21 feet in the 2010s and 120 feet in the 2020s. The records are uneven by location and measurement, with only 125 wells reporting a static water level, so this is a warning to verify current conditions rather than proof of one uniform groundwater trend.

Permit history shows long use and continuing activity

Golden has a long well history in the DWR records. Permits were issued in every decade from the 1950s through the 2020s, with the busiest period in the 1990s at 786 permits. The records include 667 permits from the 2000s, 409 from the 2010s and 196 from the 2020s. The newest permit year is 2025.

The database contains 4,246 wells within the study area. Of those, 2,475 are recorded as constructed. The most active driller names in the records are Authorized (Pe, Pg), James Drilling Company, and Aspen Drilling Company Inc. These names help when tracing local permit history, but a current bid still needs to account for access, casing, grout, formation and the exact proposed site.

A median-depth Golden well starts near the middle cost range

The cost model for Golden’s Denver Basin sedimentary bedrock uses a typical drilling rate of $50 to $70 per foot. At the 70-foot median depth, the drilled hole works out to about $3,500 to $4,900. That is only the drilling portion, not a complete operating water system.

A finished well with pump, pressure tank, trenching and electrical is modeled at about $9,500 to $16,900 at the median depth. A deeper hole, difficult access route or additional casing and grouting can move the proposal beyond that range. Get the bid in writing and ask what happens if the driller reaches the planned depth without an adequate supply. Compare the water system cost with the septic and site-development work before setting a total construction budget.

Golden buyers need to check quality, yield and septic fit

Water quantity is only one part of the decision. Within about 10 miles, the mapped environmental inventory includes 170 PFAS sampling or contamination sites, 200 historic mine features and 25 EPA Superfund or cleanup sites. Those mapped sites do not establish contamination at a particular well, but they are good reasons to review nearby land uses, test the existing well and ask what treatment may be needed.

Low-yield wells, dry holes and changing fractured-rock conditions remain practical risks. Confirm the permit’s approved use before assuming a well supports a home, irrigation or livestock. Septic setbacks, replacement-area requirements, access for drilling equipment, slope and electrical service also need review. A well that produces water may still require storage or a different building layout.

Use nearby records to plan your Golden lot

Start with the exact parcel, then compare completed wells in the nearest part of Golden rather than averaging the entire five-mile area. Look at reported depth, test yield, static water level, permit use and aquifer description. Records from West Pleasant View, Applewood, East Pleasant View, Fairmount, Genesee and Idledale can provide context, but they do not replace a site investigation.

For an existing home, obtain the permit, well construction report, pump information, recent water test and any production test. For vacant land, have a licensed driller review access and the likely target formation before you buy or finalize plans. Also confirm DWR permit requirements and water-use limits. In an over-appropriated basin, an augmentation plan may be needed for some uses. Build the well, septic and driveway decisions together.

Well permits by decade near Golden

Decade permittedWells
1950s110
1960s132
1970s389
1980s413
1990s786
2000s667
2010s409
2020s196
Most active drillers on recordWells
Authorized (Pe, Pg)709
James Drilling Company (Keaton, Michael K.)125
Aspen Drilling Company Inc (Beery, Leroy J.)93

What a new well costs in Golden, CO

Estimated cost of a new well · Golden, CO · median depth 70 ft
State & county well permit DWR application + county fee
$100–$400
Drilling, casing & grouting 70 ft × $50–$70/ft in Denver Basin sedimentary bedrock
$3,500–$4,900
Pump, pressure tank & install scales with depth
$3,000–$8,000
Trenching, water line, electrical, water test
$2,100–$8,400
Typical finished total
$9,500–$16,900

How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (300 ft) would run roughly $21,000–$33,000. See the full Colorado well cost guide.

Environmental sites mapped within about 10 miles

170PFAS sampling / contamination sites
200historic mine features
25EPA Superfund & cleanup sites

Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.

See every well near a specific address in Golden

The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.

Map wells near Golden
Building or improving land near Golden?

Tri-Lakes Contracting

Tri-Lakes Contracting is a licensed Colorado contractor serving Golden and the surrounding foothill communities with access driveways, site development, new-build septic systems and custom homes. Coordinate the site work early so drilling, septic, utilities and construction access fit the lot.

Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer

Buying land near Golden? Know what it costs to build before you buy the dirt.

A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Golden can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.

What the wrong lot can cost you · the things a listing never mentions
Long or steep driveway & access
$25k–$80k+
Rock excavation & extra earthwork
$15k–$60k+
Engineered / advanced septic instead of conventional
+$20k–$40k
Water & long utility runs
$10k–$50k+
A feasibility report
from $99

Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.

Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.

Tell us about your project

Driveway, site work, septic or a build near Golden. Licensed GC, excavator and septic installer.

Got it. Tri-Lakes will get back to you shortly.

Something went wrong sending that. Email kyle@trilakes.co instead.

Common questions about wells in Golden

How deep are wells in Golden, Colorado?

Golden wells in the records have a 70-foot median depth, with the middle half from 29 to 300 feet. About 55% are under 100 feet, but the 90th percentile is 565 feet and the deepest record is 1,997 feet. Local formation, elevation and fractured-bedrock conditions can make one parcel very different from another.

How much does it cost to drill a well in Golden?

The local cost model uses $50 to $70 per foot. At the 70-foot median depth, drilling is about $3,500 to $4,900. A finished system with pump, tank, trenching and electrical is estimated at $9,500 to $16,900. Access, extra depth, casing, grout and site conditions can change the final bid.

How much water do Golden wells produce?

Reported pump yields have a 7.2-gallon-per-minute median, with the middle half from 5.0 to 11.0 gallons per minute. About 3% report under 1 gallon per minute, while 64% fall between 5 and 15 gallons per minute. Only 503 wells report yield, so request the actual test for the property.

Is well water safe to drink in Golden?

The permit records do not establish that any individual well is safe to drink. Nearby mapped environmental information includes 170 PFAS sampling or contamination sites, 200 historic mine features and 25 EPA Superfund or cleanup sites. Test an existing well through a qualified laboratory and review local land-use and cleanup information before relying on it.

Is groundwater getting deeper in Golden?

The reported decade medians vary rather than showing a simple steady trend: 26 feet below surface in the 1960s, 92 feet in the 1980s, 21 feet in the 2010s and 120 feet in the 2020s. Only 125 wells report static water level, and locations differ, so obtain a current measurement for the specific property.

Keep researching

More in Jefferson County

All wells in Jefferson County — county-wide depth, yield and cost figures.

Nearby areas

Driveway, septic, site work or a build near Golden?Licensed GC, excavator & septic installer. Tell us what you need — 30 seconds.