A shallow well record near Englewood does not necessarily tell you what a household water supply will require. Monitoring accounts for 60% of permitted uses in this dataset, while domestic and household uses account for 17%. That distinction matters when comparing depths or pricing a new well.
This Denver County reference covers DWR permit records within 5 miles of Englewood, including nearby Sheridan, Cherry Hills Village and Littleton. Of 7,552 permit records, 3,567 are recorded as constructed. Use the map to find comparable supply wells, not simply the closest permit pins.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Englewood. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 21 |
| Median | 31 |
| 75th percentile | 57 |
| 90th percentile | 490 |
| Deepest on record | 2,200 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 5,968 |
| Alluvial | 397 |
| Denver | 201 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 9.0 |
| Median | 13.8 |
| 75th percentile | 16.8 |
| Median depth to water | 15 ft |
| Median water level by decade | Depth to water |
|---|---|
| 1950s | 30 ft |
| 1960s | 45 ft |
| 2010s | 16 ft |
| 2020s | 13 ft |
Among 4,329 records reporting depth, the median is 31 ft, and the middle half runs 21-57 ft. Overall, 82% are under 100 ft. Those figures describe a heavily monitoring-oriented inventory, not a dependable depth allowance for a new domestic well.
The deeper end tells a different story: the 90th percentile is 490 ft, and the deepest record reaches 2,200 ft. Permits name Alluvial and Denver aquifers, while many aquifer entries are unnamed or grouped as fractured bedrock. Shallow alluvial groundwater and deeper Denver Basin sedimentary formations call for different construction. Have a driller identify the intended water-bearing formation before using neighborhood depths to set a bid.
Only 250 records report a pump yield, so the yield figures describe a much smaller sample than the depth figures. The median is 13.8 gpm, with the middle half at 9.0-16.8 gpm. Those reported rates can be encouraging for household supply, but a recorded pump yield is not a guarantee of sustained production.
The low end deserves attention: 3% report under 1 gpm, and 11% report 1-5 gpm. A low-producing well may need storage and careful demand management. Before buying, ask for a current pumping and recovery test. Compare wells with the same use and aquifer around Sheridan or Cherry Hills Village rather than treating every nearby monitoring well as a household example.
Static water level is the depth to resting water, not the depth of the drilled hole. The 122 reporting records have a median water level of 15 ft below ground, with the middle half at 11-26 ft. That does not mean a usable supply can be completed at those depths.
The decade medians are 30 ft in the 1950s, 45 ft in the 1960s, 16 ft in the 2010s and 13 ft in the 2020s. These readings do not demonstrate a dropping water table; the more recent medians are shallower. They also are not repeated measurements from an identical set of wells. Different locations, aquifers and monitoring purposes prevent treating this series as a property-level groundwater forecast.
Permit issuance was busiest in the 2000s, with 2,080 records, following 1,832 in the 1990s. The dataset shows 814 in the 2010s and 452 in the 2020s, with the newest permit dated 2025. Because monitoring uses dominate, these totals should not be read as a count of new homes supplied by wells.
The largest driller-field entry is “Authorized (Pe, Pg)” at 3,091 records; treat that as a database label rather than an identifiable drilling company. Named entries include Hier Drilling Co Inc (Hier, Bruce A.) with 236 and Ground Exploration Llc (Bender, Joseph T.) with 113. Historical record volume does not establish current availability or experience with your proposed supply well.
The supplied Denver Basin sedimentary-bedrock cost model uses $50-$70 per foot. At the recorded median depth, that puts the drilled hole at about $1,600-$2,200. A finished well with pump, tank, trenching and electrical is modeled at about $7,600-$14,200.
Those are median-depth scenarios, not a reliable quote for a domestic well. The shallow, monitoring-heavy records can make that allowance look more representative than it is. Ask for a written scope covering the intended formation, casing, grout, pump equipment and site access. Clarify how additional depth, difficult construction or an unsuccessful hole would be billed. A supply well requiring deeper bedrock drilling needs its own estimate rather than the shallow median plugged into a budget.
Within about 10 miles, the map identifies 492 PFAS sampling or contamination sites, 153 EPA Superfund or cleanup sites and 27 historic mine features. These are screening flags, not proof that a particular well is contaminated. A PFAS sampling location also does not automatically represent a confirmed contamination source.
Review nearby site records and obtain water testing suited to the property’s setting. Inspect the wellhead, casing and surface drainage, and coordinate any septic proposal with required well separation and local approval. The reported low-yield share supports checking production, but this dataset does not establish a dry-hole rate. Do not accept a clean-looking sample or a neighboring productive well as a substitute for testing the actual supply.
Start with the property’s legal water supply, then work outward to comparable wells. For lots near Bow Mar, Columbine Valley, Holly Hills or Littleton, confirm whether public water service is available or required and whether DWR can authorize the proposed well. An existing permit does not automatically allow every household, irrigation or construction-related use.
Match the permit to the actual well and obtain the completion report, pump information, water-quality results and current production testing. For a new build, coordinate the well location with drilling access, the driveway, utilities, foundation and any septic system. Make water feasibility part of purchase due diligence, before committing to a site plan that leaves no practical room for construction or maintenance.
| Decade permitted | Wells |
|---|---|
| 1950s | 188 |
| 1960s | 162 |
| 1970s | 282 |
| 1980s | 284 |
| 1990s | 1,832 |
| 2000s | 2,080 |
| 2010s | 814 |
| 2020s | 452 |
| Most active drillers on record | Wells |
|---|---|
| Authorized (Pe, Pg) | 3,091 |
| Hier Drilling Co Inc (Hier, Bruce A.) | 236 |
| Ground Exploration Llc (Bender, Joseph T.) | 113 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (57 ft) would run roughly $8,850–$15,990. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near EnglewoodFor an Englewood-area lot, Tri-Lakes Contracting is a licensed Colorado contractor for access driveways, site development, new-build septic systems and custom homes. Coordinate that site work with the property’s water-supply plan and local utility requirements.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Englewood can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Englewood. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The recorded median depth is 31 ft, and the middle half is 21-57 ft among 4,329 depth-reporting records within 5 miles. However, monitoring represents 60% of permitted uses. A new household well may need a different formation and substantially greater depth, so compare nearby domestic wells before setting a drilling budget.
The supplied cost model uses $50-$70 per foot for Denver Basin sedimentary bedrock. At the 31 ft median depth, the hole is about $1,600-$2,200, or $7,600-$14,200 finished with pump, tank, trenching and electrical. Monitoring wells heavily influence that shallow median, so a domestic supply needs a site-specific quote.
The 250 records reporting pump yield have a median of 13.8 gpm, with the middle half at 9.0-16.8 gpm. At the low end, 3% report under 1 gpm and 11% report 1-5 gpm. Ask for current pumping and recovery testing because a historical yield does not guarantee dependable household supply.
The records cannot establish drinking-water safety for an individual property. Within about 10 miles are 492 PFAS sampling or contamination sites and 153 EPA Superfund or cleanup sites. Their presence does not prove your well is affected. Review relevant site records and arrange laboratory testing, including contaminants appropriate to the location.
The supplied decade medians do not show a dropping table: recorded depths to water are 30 ft in the 1950s, 45 ft in the 1960s, 16 ft in the 2010s and 13 ft in the 2020s. These are different groups of measurements, not a continuous record proving conditions at your property.
All wells in Denver County — county-wide depth, yield and cost figures.