Colorado Well Finder › Wells by county › Elbert County
A well budget near Elizabeth or Kiowa should start with nearby completion records, not a countywide average alone. Elbert County's recorded median well depth is 341 feet, with a median reported pump yield of 12.0 gpm. Those are useful starting points, but the aquifer beneath the property matters more than the mailing address.
Colorado DWR records include 17,502 permitted wells countywide, with 10,074 recorded as constructed. A permit on the map is not proof that a working well exists on the ground.
Figures are computed from Colorado Division of Water Resources permit records for all permitted wells in the county. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 225 |
| Median | 341 |
| 75th percentile | 450 |
| 90th percentile | 615 |
| Deepest on record | 3,880 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 5,376 |
| Upper Dawson | 3,389 |
| Denver | 2,569 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 10.0 |
| Median | 12.0 |
| 75th percentile | 14.0 |
| Median depth to water | 165 ft |
| Median water level by decade | Depth to water |
|---|---|
| 1950s | 30 ft |
| 1960s | 66 ft |
| 1970s | 100 ft |
| 1980s | 125 ft |
| 1990s | 222 ft |
| 2000s | 197 ft |
| 2010s | 160 ft |
| 2020s | 185 ft |
Of the 10,532 wells reporting depth, the median is 341 feet and the middle half fall between 225 and 450 feet. For a drilling bid, that means the median is a planning allowance—not a depth the contractor can promise. The 90th-percentile depth is 615 feet, so deeper work is a real possibility.
Denver Basin aquifer wells account for 97% of the records. Upper Dawson and Denver are prominent named aquifers, and the cost model assumes sedimentary bedrock. Ask which aquifer the proposed well will target. Compare completed wells near Ponderosa Park, Elizabeth, Simla or Matheson in that same aquifer rather than treating every county well as a comparable.
The 7,456 records with pump yields show a median of 12.0 gpm, with the middle half between 10.0 and 14.0 gpm. That is an encouraging household supply benchmark, provided the well can sustain it. A reported pumping rate is not the same as a long-duration test of dependable production.
The yield summary places 5% in the 1-5 gpm range and reports 0% below 1 gpm. Do not read that as a guarantee against a weak well; the summary covers reported yields, not every permit. Before buying, have the well's sustained output, recovery and pressure equipment evaluated. Also verify permitted uses before assuming household water can serve livestock or irrigation.
Static water level is the resting depth to water, not the bottom of the drilled hole. Among 1,029 reporting wells, the median is 165 feet below ground, with the middle half at 97-240 feet. That distinction matters when evaluating pump placement and the water available above the pump during use.
Decade medians deepen from 30 feet in the 1950s to 222 feet in the 1990s, then fluctuate: 197 in the 2000s, 160 in the 2010s and 185 in the 2020s. The series suggests deeper water than in early records, but not a steady countywide decline. These are different groups of measurements, not repeated monitoring of the same wells.
Permit issuance was highest in the supplied decade totals during the 1990s, with 4,138 permits, followed by 3,479 in the 2000s. The records show 2,240 in the 2010s and 1,404 in the 2020s, with the newest permit dated 2026. The current decade is incomplete, and issuance does not establish when construction actually happened.
The most active drillers listed are Hamacher Well Works Inc with 3,994 records, Parker Drilling/Pump Service Inc. with 1,395, and Hier Drilling Co Inc with 1,163. Those counts show historical involvement, not current availability. When requesting a bid, ask about recent work near your property and experience with the proposed aquifer.
The supplied drilling model uses $50-$70 per foot for Denver Basin sedimentary bedrock. At the county's 341-foot median depth, that puts the drilled hole at about $17,000-$23,900. A finished well with pump, tank, trenching and electrical is modeled at $23,000-$35,900.
Use that range to screen a project budget, not as a parcel-specific quote. A deeper aquifer target, difficult equipment access or a long utility route can change the scope. Have bids spell out casing, grout, pump equipment and connection work. On land near Elizabeth, Kiowa or Elbert, settle the likely house location and access route before comparing finished-well proposals.
The supplied environmental mapping identifies 40 PFAS sampling/contamination sites, 5 EPA Superfund/cleanup sites and 1 historic mine feature within about 10 miles. These are screening flags, not evidence that a particular Elbert County well is contaminated. Check the actual site locations and available findings before deciding what testing the property needs.
For an existing well, arrange laboratory testing rather than judging safety by taste or clarity. Have casing and wellhead condition checked, along with septic placement and drainage around the well. For undeveloped land, discuss low-production or unsuccessful drilling terms with the driller before work starts. Keep the well, septic area, driveway and building footprint coordinated.
Start with the parcel's DWR permit, construction report and pump record. Confirm that an existing well belongs to the property and that its authorized uses match your plans. A household-use authorization should not be assumed to allow lawn irrigation or stock watering. Ask DWR what permit and water-right requirements apply before committing to a new well.
Then compare nearby completed wells around your actual location—Elizabeth, Kiowa, Elbert, Simla or Matheson—not just the county median. Match aquifer names where available. Make the purchase decision with a water-quality report, a production assessment and a site layout that leaves workable room for drilling access, septic approval and the proposed home.
| Decade permitted | Wells |
|---|---|
| 1950s | 144 |
| 1960s | 257 |
| 1970s | 1,528 |
| 1980s | 1,973 |
| 1990s | 4,138 |
| 2000s | 3,479 |
| 2010s | 2,240 |
| 2020s | 1,404 |
| Most active drillers on record | Wells |
|---|---|
| Hamacher Well Works Inc (Hamacher, Alan Ray) | 3,994 |
| Parker Drilling/Pump Service Inc. (Thrasher, Tommy E.) | 1,395 |
| Hier Drilling Co Inc (Hier, Bruce A.) | 1,163 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (450 ft) would run roughly $28,500–$43,500. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near Elbert CountyFor an Elbert County lot, Tri-Lakes Contracting is a licensed Colorado contractor for access driveways, site development, new-build septic systems and custom homes. Coordinate that site work with the proposed well location before fixing the building layout.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Elbert County can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Elbert County. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median recorded depth is 341 feet, and the middle half of wells are 225-450 feet deep. The 90th-percentile depth is 615 feet. These figures come from 10,532 depth reports. For a specific lot, compare nearby completed wells targeting the same aquifer before using the county median in a drilling budget.
The supplied model estimates $50-$70 per foot in Denver Basin sedimentary bedrock. At the 341-foot median depth, the drilled hole is about $17,000-$23,900. A finished well with pump, tank, trenching and electrical is about $23,000-$35,900. Get a written scope based on the aquifer target, access and proposed utility route.
Reported pump yields have a median of 12.0 gpm, with the middle half at 10.0-14.0 gpm. That is a useful household benchmark, but an individual well needs testing. The records place 5% in the 1-5 gpm range. Check sustained production, recovery and permitted uses rather than relying only on the recorded pump rate.
County depth and yield records cannot establish drinking-water safety. The supplied mapping includes 40 PFAS sampling/contamination sites and 5 EPA Superfund/cleanup sites within about 10 miles, but proximity does not prove contamination at a well. Obtain laboratory testing and review nearby site findings, wellhead condition and septic placement before relying on the supply.
The decade medians show deeper static water levels than early records, but not a continuous decline. Median depth to water was 222 feet in the 1990s, 160 feet in the 2010s and 185 feet in the 2020s. Because these are grouped measurements from different wells, they do not establish the trend at a particular property.
Driveway, septic, site development, feasibility or a custom build near Elbert County.
Shopping a lot? Run the $99 instant buildability check →