Colorado Well Finder › Wells by county › El Paso County › Woodmoor
Woodmoor sits over Denver Basin sedimentary bedrock, and the permitted wells mapped within 5 miles show a fairly consistent pattern: most completed wells are in the 300-to-600-foot range, with a median depth of 315 feet. Reported yields are stronger than many buyers expect, but depth, water level, and construction cost still vary from lot to lot.
This page uses Colorado DWR permit records for the Woodmoor area, including nearby Monument, Palmer Lake, and Gleneagle. Treat the figures as planning information, not a guarantee for a particular parcel. A driller still needs to review the lot, access, geology, nearby well records, and the intended household use.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Woodmoor. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 260 |
| Median | 315 |
| 75th percentile | 405 |
| 90th percentile | 549 |
| Deepest on record | 2,500 |
| Aquifer named on permits | Wells |
|---|---|
| Dawson | 3,089 |
| unnamed / fractured-bedrock aquifer | 2,100 |
| Denver | 384 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 10.0 |
| Median | 11.0 |
| 75th percentile | 13.0 |
| Median depth to water | 120 ft |
| Median water level by decade | Depth to water |
|---|---|
| 1970s | 135 ft |
| 1980s | 125 ft |
| 1990s | 121 ft |
| 2000s | 130 ft |
| 2010s | 110 ft |
| 2020s | 125 ft |
The median permitted well depth near Woodmoor is 315 feet. The middle half runs from 260 to 405 feet, which is the most useful range when reviewing a drilling bid. A quote based on a hole around the median may be reasonable, but the local records also reach the 90th percentile at 549 feet, with the deepest recorded well at 2,500 feet.
Depth mix matters here. Six percent of reported wells are under 100 feet, 28% are from 100 to 300 feet, 58% are from 300 to 600 feet, and 8% are deeper than 600 feet. Permits name the Dawson aquifer most often, followed by unnamed or fractured-bedrock aquifers and the Denver aquifer. Denver Basin aquifer wells account for 100% of the records.
Among wells with a reported pump yield, the median is 11.0 gallons per minute, and the middle half is 10.0 to 13.0 gallons per minute. Most reported wells fall between 5 and 15 gallons per minute: that group represents 82% of the records. Another 17% report more than 15 gallons per minute.
Low-yield results are uncommon in this dataset, with 1% reporting 1 to 5 gallons per minute and 0% under 1 gallon per minute. That does not guarantee a strong well on a specific lot. The permit yield is a measured or reported result, not a promise of long-term supply. Ask how the well was tested and match storage and pump equipment to the home’s demand. An exempt household-use well is generally subject to a 35-gallon-per-minute pumping limit.
The median static water level is 120 feet below the surface, with the middle half from 89 to 165 feet. That figure helps with pump planning and gives a buyer a practical comparison point when reviewing neighboring wells. It is not the same as total well depth: a well can continue substantially below the standing water level.
The decade figures do not show a steady downward trend. The median was 135 feet below surface in the 1970s, 125 in the 1980s, 121 in the 1990s, 130 in the 2000s, 110 in the 2010s, and 125 in the 2020s. The record is better described as fluctuating than as a consistent decline. Confirm current conditions with nearby wells and a driller before relying on a historical median.
Permit activity expanded substantially after the early records. The DWR file shows 34 permits from the 1950s, 55 from the 1960s, 590 from the 1970s, 845 from the 1980s, 1,451 from the 1990s, 1,021 from the 2000s, 675 from the 2010s, and 534 from the 2020s. The newest permit year in the area is 2025.
In the recorded drilling history, Fletcher Drilling, associated with Fletcher, Thomas, appears on 1,603 wells. Kunau Drilling LLC, associated with Kunau, Timothy R., appears on 1,068. Hamacher Well Works Inc., associated with Hamacher, Alan Ray, appears on 579. These records show who has worked nearby, but they are not a recommendation or a substitute for checking current licensing, insurance, availability, and references.
The cost model for Woodmoor’s Denver Basin sedimentary bedrock uses a drilling rate of $50 to $70 per foot. At the 315-foot median depth, the drilled hole works out to about $15,800 to $22,000. That is only the drilling portion of the project.
A finished well including the pump, pressure tank, trenching, and electrical is estimated at about $21,800 to $34,000 at the median depth. A deeper hole, difficult access, longer utility runs, casing or grout requirements, and site conditions can move the actual bid outside that planning range. When comparing proposals, confirm what is included, the assumed depth, casing and grout, pump capacity, testing, permits, trenching, electrical work, and restoration.
Water quality deserves its own review. The mapped area within about 10 miles includes 25 PFAS sampling or contamination sites, 4 historic mine features, and 1 EPA Superfund or cleanup site. Those mapped locations do not prove contamination at a particular well, but they are a reason to obtain a current laboratory water test and review the well’s construction and history.
Also investigate low yield, dry-hole risk, and the distance between the well, septic system, and proposed building. Casing and grout protect the well from surface entry, but condition and installation matter. Domestic or household use represents 84% of the recorded use mix. Stock, irrigation, and monitoring wells make up other portions, so verify that an existing permit matches your intended use. In an over-appropriated basin, an augmentation plan may be required for some uses.
Before making an offer, pull the nearby DWR permits and compare total depth, reported yield, static water level, aquifer name, use, and construction details. The records within 5 miles provide a useful starting point, especially when a parcel has no well yet. Monument, Palmer Lake, Gleneagle, and the Air Force Academy can provide additional local context, but conditions can change across short distances.
For a new build, have a driller inspect access and identify a practical well location before finalizing the house site. Price the well together with septic, driveway, trenching, electrical service, storage, and testing. Confirm legal water use before construction, particularly if the property is in an area requiring augmentation. A strong neighboring yield is encouraging, but it is not a guarantee for your lot.
| Decade permitted | Wells |
|---|---|
| 1950s | 34 |
| 1960s | 55 |
| 1970s | 590 |
| 1980s | 845 |
| 1990s | 1,451 |
| 2000s | 1,021 |
| 2010s | 675 |
| 2020s | 534 |
| Most active drillers on record | Wells |
|---|---|
| Fletcher Drilling (Fletcher, Thomas) | 1,603 |
| Kunau Drilling Llc (Kunau, Timothy R.) | 1,068 |
| Hamacher Well Works Inc (Hamacher, Alan Ray) | 579 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (405 ft) would run roughly $26,250–$40,350. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near WoodmoorTri-Lakes Contracting is a licensed Colorado contractor serving Woodmoor and nearby communities with access driveways, site development, new-build septic systems, and custom homes. Their early site review can help coordinate the well, septic, driveway, utilities, and house placement.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Woodmoor can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Woodmoor. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median permitted well depth within 5 miles of Woodmoor is 315 feet. The middle half runs from 260 to 405 feet, while 58% of reported wells are 300 to 600 feet deep. Some are much deeper: the 90th percentile is 549 feet, and the deepest recorded well reaches 2,500 feet.
The local cost model uses $50 to $70 per foot. At the 315-foot median depth, drilling the hole is estimated at $15,800 to $22,000. A finished well with pump, tank, trenching, and electrical is estimated at $21,800 to $34,000. Actual bids depend on access, depth, construction, and utility distances.
The median reported pump yield is 11.0 gallons per minute, with the middle half from 10.0 to 13.0 gallons per minute. Eighty-two percent of reported wells produce 5 to 15 gallons per minute, while 17% report more than 15. A neighboring result is useful evidence, but it does not guarantee the same yield on your parcel.
Safety cannot be determined from depth or yield alone. Mapped sites within about 10 miles include 25 PFAS sampling or contamination sites, 4 historic mine features, and 1 EPA Superfund or cleanup site. Have the well water tested by a qualified laboratory, review construction records, and check the well’s location relative to possible sources before drinking it.
The recorded decade medians do not show a steady decline. Static water levels were 135 feet below surface in the 1970s, 125 in the 1980s, 121 in the 1990s, 130 in the 2000s, 110 in the 2010s, and 125 in the 2020s. The pattern fluctuates, so current neighboring-well data remains important for a purchase or new build.
All wells in El Paso County — county-wide depth, yield and cost figures.
Driveway, septic, site development, feasibility or a custom build near Woodmoor.
Shopping a lot? Run the $99 instant buildability check →