Colorado Well Finder › Wells by county › Pueblo County › Vineland
Well records near Vineland show a shallow plains-water setting, but the records are not uniform. Of 2,341 wells in the Colorado DWR data, 1,756 are recorded as constructed, 1,802 report total depth, 131 report pump yield, and 28 report static water level.
Most reported wells are shallow and productive, with a 36-foot median depth and a 15.0-gpm median reported yield. That does not guarantee the result on a particular lot. Before buying or building, compare nearby permits, confirm the intended use, and treat water quality, septic layout, and electrical access as separate parts of the project.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Vineland. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 30 |
| Median | 36 |
| 75th percentile | 44 |
| 90th percentile | 53 |
| Deepest on record | 2,052 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 2,310 |
| Pierre Shale | 9 |
| Alluvial | 6 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 13.0 |
| Median | 15.0 |
| 75th percentile | 32.5 |
| Median depth to water | 18 ft |
| Median water level by decade | Depth to water |
|---|---|
| 2020s | 17 ft |
Across the permitted wells within 5 miles of Vineland, the median total depth is 36 feet. The middle half runs from 30 to 44 feet, and the 90th percentile is 53 feet. That pattern gives a driller a useful starting point for a bid: ordinary local work appears shallow, so a proposal based on a much deeper hole should explain the site-specific reason.
The depth mix is especially clear: 98% of wells are under 100 feet, 1% fall between 100 and 300 feet, and 1% are 600 feet or deeper. The deepest record reaches 2,052 feet. Those unusual records are a reminder not to use the median as a promise. Ground conditions, the target aquifer, casing and grout requirements, and the exact lot can change the plan.
Among the limited number of records that report pump yield, the median is 15.0 gallons per minute, with the middle half from 13.0 to 32.5 gallons per minute. Sixty-seven percent report more than 15 gallons per minute, while 32% report between 5 and 15 gallons per minute. Only 1% report less than 1 gallon per minute.
For a buyer, that distribution is encouraging for ordinary domestic use, but it is not a guarantee of household performance. Only 131 wells report a pump yield, so the sample is much smaller than the depth record. Ask for the neighboring well’s yield test, storage setup, and intended use. A domestic well, stock well, and irrigation well may have different permit conditions and practical demands.
The 28 wells reporting static water level show a median depth to water of 18 feet. The middle half is from 13 to 26 feet. That is consistent with a shallow water-bearing setting, but a static level is not the same as available well yield, and it can vary with pumping, recharge, season, and nearby use.
The permit counts by decade do not establish a water-table trend. Records include 166 permits from the 1950s, 209 from the 1960s, 288 from the 1970s, 105 from the 1980s, 197 from the 1990s, 240 from the 2000s, 145 from the 2010s, and 41 from the 2020s. Those are permit totals, not repeated measurements of groundwater elevation. Get a current water-level measurement when evaluating a specific property.
Permits near Vineland extend from the 1950s through the newest permit year, 2025. The largest decade in this record is the 1970s, with 288 permits. Use mix is led by domestic and household wells at 57%, followed by irrigation at 29% and stock at 11%. Monitoring accounts for 10%.
The most active names in the records are Don Stewart & Son Drilling, listed as Stewart, Donald D, with 194 permits; Authorized, listed as Pe, Pg, with 115; and Wratislaw, Fred, with 48. These listings show recorded permit activity, not a recommendation or a guarantee of current availability. Confirm licensing, insurance, scope, and the contractor’s plan for your parcel before signing a drilling agreement.
For Vineland’s alluvium and plains sedimentary rock, the drilling model uses a typical rate of $35-$55 per foot. At the 36-foot median depth, the drilled hole alone is estimated at about $1,300-$2,000. That is only the drilling portion, not the infrastructure needed to use the water.
A finished system with pump, pressure tank, trenching, and electrical is modeled at about $7,300-$14,000. A bid should state the assumed depth, casing and grout, pump size, testing, permits, trench length, power connection, and site restoration. The deepest recorded well is not a normal cost assumption, but it shows why a written allowance for additional depth matters if the driller does not reach a suitable water-bearing zone.
The aquifer names on permits are dominated by unnamed or fractured-bedrock aquifer records, with 2,310 wells. Pierre Shale appears on 9 permits and Alluvial on 6; no Denver Basin aquifer wells are recorded. Fractured or irregular formations can be less predictable than the local median suggests, so review the actual nearby logs rather than relying on a map label.
There are 41 PFAS sampling or contamination sites and 34 EPA Superfund or cleanup sites within about 10 miles. That does not prove a problem at a particular lot, but it supports testing before closing and again after construction if appropriate. Plan the well, septic system, house, access, and electrical route together. Confirm setback requirements, septic soil suitability, and whether the lot can support the intended use before drilling.
Start with the closest completed wells, not just the countywide impression. Compare depth, construction notes, reported yield, static water level, use, and permit status. The nearby reference areas include Blende and Avondale at 6 miles, Salt Creek at 7 miles, Pueblo at 8 miles, Boone at 11 miles, and Pueblo West at 18 miles. The closest records should carry the most weight, but broader comparisons can reveal how variable the area is.
For a new build, verify the DWR permit path before excavation. An exempt household-use well still has limits, including the 35-gpm exempt-well pumping limit, and an augmentation plan may be needed in an over-appropriated basin. Have the driller and septic contractor coordinate access, casing, grout, pump, storage, trenching, and testing. Put contingencies in the purchase contract for water quality, usable yield, and unexpected drilling depth.
| Decade permitted | Wells |
|---|---|
| 1950s | 166 |
| 1960s | 209 |
| 1970s | 288 |
| 1980s | 105 |
| 1990s | 197 |
| 2000s | 240 |
| 2010s | 145 |
| 2020s | 41 |
| Most active drillers on record | Wells |
|---|---|
| Don Stewart & Son Drilling (Stewart, Donald D) | 194 |
| Authorized (Pe, Pg) | 115 |
| Wratislaw, Fred | 48 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (44 ft) would run roughly $7,540–$14,420. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near VinelandTri-Lakes Contracting is a licensed Colorado contractor serving Vineland and nearby Pueblo County areas with access driveways, site development, new-build septic systems, and custom homes. Coordinate the site work early so the well, septic system, utilities, and building plans fit together.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Vineland can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Vineland. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median reported well depth near Vineland is 36 feet. The middle half of wells is 30 to 44 feet, and 98% are under 100 feet. The deepest record is 2,052 feet, so the median is a planning reference rather than a guarantee for a particular parcel.
The local drilling model uses $35-$55 per foot. At the 36-foot median depth, the drilled hole is estimated at about $1,300-$2,000. A finished system with pump, tank, trenching, and electrical is estimated at $7,300-$14,000. Ask what depth and site work each bid includes.
The median reported pump yield is 15.0 gallons per minute, with the middle half from 13.0 to 32.5 gallons per minute. Sixty-seven percent of reported yields exceed 15 gallons per minute, while 1% are under 1 gallon per minute. Only 131 records report yield, so check the closest well tests.
Permit records do not establish that a specific well is safe to drink. There are 41 PFAS sampling or contamination sites and 34 EPA Superfund or cleanup sites within about 10 miles. Test the property’s water before closing and use a qualified laboratory to evaluate contaminants relevant to the location.
Review nearby DWR permits, construction logs, depth, yield, and static water level. The local median static water level is 18 feet, but only 28 records report it. Confirm the well permit, intended use, septic suitability, water quality, access for drilling, electrical routing, and any augmentation-plan requirements before committing to construction.
All wells in Pueblo County — county-wide depth, yield and cost figures.
Driveway, septic, site development, feasibility or a custom build near Vineland.
Shopping a lot? Run the $99 instant buildability check →