Colorado Well Finder › Wells by county › Morgan County › Trail Side
For a rural property near Trail Side, the local well records point to relatively shallow wells with strong reported yields. Within 5 miles, 2,150 permitted wells are on file, including 1,544 recorded as constructed. A buyer should still treat the records as a planning guide, not a guarantee for one lot. The actual result depends on the site, aquifer, casing and grout design, and the driller’s experience.
Trail Side is on the plains in Morgan County, close to Log Lane Village, Morgan Heights, Fort Morgan, Blue Sky, Saddle Ridge, and Weldona. Reviewing nearby permits before buying can help set expectations for depth, pump sizing, water quality testing, and the cost of getting a usable well into service.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Trail Side. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 68 |
| Median | 100 |
| 75th percentile | 125 |
| 90th percentile | 160 |
| Deepest on record | 500 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 1,972 |
| Alluvial | 87 |
| Quaternary Alluvium | 44 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 15.0 |
| Median | 15.0 |
| 75th percentile | 466.5 |
| Median depth to water | 33 ft |
| Median water level by decade | Depth to water |
|---|---|
| 2010s | 22 ft |
| 2020s | 35 ft |
The median reported well depth near Trail Side is 100 feet. The middle half runs from 68 to 125 feet, so that range is a reasonable starting point when reviewing a drilling bid or a neighboring permit. Forty-nine percent of wells are under 100 feet, while 51% fall between 100 and 300 feet. One percent are between 300 and 600 feet, and none are recorded at 600 feet or deeper.
The deepest well on record is 500 feet. Local ground conditions are described as alluvium and plains sedimentary rock, while permits most often identify an unnamed or fractured-bedrock aquifer. That combination can produce useful shallow wells, but fractured material remains less predictable than a uniform sand and gravel section. A driller should confirm casing and grout requirements for the specific site.
Of the local records, 311 report a pump yield. The median reported yield is 15.0 gallons per minute, and the middle half ranges from 15.0 to 466.5 gallons per minute. Ninety-five percent of reported wells produce more than 15 gallons per minute. Five percent fall between 5 and 15 gallons per minute, with none reported below 5 gallons per minute or between 1 and 5 gallons per minute.
Those figures are encouraging for a household buyer, but a permit yield is not the same as a guaranteed long-term supply. Ask for the well construction report, pump test information, and any production history. An exempt household-use well is generally limited to 35 gallons per minute for pumping, and larger or different uses can require different water-rights review.
Only 69 wells report a static water level, so this part of the dataset is smaller than the depth and permit totals. Among those records, the median depth to water is 33 feet, with the middle half from 16 to 51 feet below the surface. That helps explain why many wells in the area can be completed at modest total depths, but it should not be used as a site-specific water-level promise.
The decade comparison deserves attention. The median reported water level was 22 feet below the surface in the 2010s and 35 feet in the 2020s. That is a deeper recent median in this dataset, but the number of reporting wells and their locations can change by decade. Check the closest permits and current test information before assuming the water table is steadily dropping.
Permits appear across nearly every decade in the record. The largest listed decade is the 1950s with 285 permits, followed by 267 in the 1970s, 244 in the 2000s, 213 in the 1990s, 143 in the 2010s, 128 in the 1980s, 118 in the 1960s, and 68 in the 2020s. The newest permit year is 2025.
Canfield Drilling Company, also listed as Canfield, Harold E, is the most active driller in these records with 360 entries. Canfield, Leslie George has 211, and Authorized (Pe, Pg) has 181. These names show who appears often in the permit history; they are not a recommendation or a substitute for checking current licensing, references, and availability.
The local cost model uses a typical drilling rate of $35 to $55 per foot for alluvium and plains sedimentary rock. At the 100-foot median depth, the drilled hole works out to about $3,500 to $5,500. That is only the hole. A finished system with pump, pressure tank, trenching, and electrical is modeled at about $9,500 to $17,500.
A written bid should identify the assumed depth, casing and grout, pump equipment, electrical distance, trenching, testing, permits, and restoration. A shallow well can still cost more than expected if access is difficult, the pump setting changes, or the well must go deeper. Compare bids on the same scope rather than comparing only the per-foot drilling rate.
Environmental review matters around Trail Side. Mapping within about 10 miles shows 22 PFAS sampling or contamination sites and 3 EPA Superfund or cleanup sites. There are no historic mine features mapped in that area. These records do not prove contamination at a particular parcel, but they are a reason to test existing well water and discuss PFAS and other appropriate laboratory work before closing.
Also inspect the septic and building plan, not just the well permit. Confirm the proposed well location, septic setbacks, reserve area, access for a rig, electrical route, and room for tanks or treatment equipment. Permits in the area are used for domestic or household use, stock, irrigation, and monitoring, so the permitted use must match the buyer’s intended use. Over-appropriated basins may require an augmentation plan.
| Decade permitted | Wells |
|---|---|
| 1950s | 285 |
| 1960s | 118 |
| 1970s | 267 |
| 1980s | 128 |
| 1990s | 213 |
| 2000s | 244 |
| 2010s | 143 |
| 2020s | 68 |
| Most active drillers on record | Wells |
|---|---|
| Canfield Drilling Company (Canfield, Harold E) | 360 |
| Canfield, Leslie George | 211 |
| Authorized (Pe, Pg) | 181 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (125 ft) would run roughly $10,375–$18,875. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near Trail SideTri-Lakes Contracting is a licensed Colorado contractor serving Trail Side and the surrounding Morgan County area with access driveways, site development, new-build septic systems, and custom homes. Coordinate the well, septic, driveway, and building layout early so the lot works as a complete site.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Trail Side can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Trail Side. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median reported well depth within 5 miles of Trail Side is 100 feet. The middle half runs from 68 to 125 feet. Forty-nine percent are under 100 feet, while 51% are between 100 and 300 feet. The deepest record is 500 feet, so a buyer should budget for variation rather than assume every lot will be shallow.
Among the 311 wells reporting a pump yield, the median is 15.0 gallons per minute. The middle half ranges from 15.0 to 466.5 gallons per minute, and 95% report more than 15 gallons per minute. These are reported permit figures, not a guarantee for a new well. Request the nearby well report and any pump-test details.
The local model uses $35 to $55 per foot. At the 100-foot median depth, drilling the hole is estimated at $3,500 to $5,500. A finished system with pump, tank, trenching, and electrical is estimated at $9,500 to $17,500. Your bid can differ if the site needs more depth, difficult access, added treatment, or longer utility runs.
Do not assume a private well is safe without testing. Mapping within about 10 miles shows 22 PFAS sampling or contamination sites and 3 EPA Superfund or cleanup sites. Those locations do not establish a problem at your parcel, but they support testing before purchase and after construction. Review the results with a qualified laboratory or water professional.
Yes. Nearby permits can show reported depth, yield, static water level, construction details, and intended use. Trail Side records include 2,150 permitted wells, but only 69 report a static water level and 311 report a pump yield. That makes the closest comparable records especially important. Use them to shape a drilling budget, then confirm conditions with a licensed driller.
All wells in Morgan County — county-wide depth, yield and cost figures.
Driveway, septic, site development, feasibility or a custom build near Trail Side.
Shopping a lot? Run the $99 instant buildability check →