Colorado Well Finder › Wells by county › Las Animas County › Segundo
If you are buying land or a home near Segundo, the local well records point to moderate but variable drilling conditions. Permitted wells within 5 miles have a median reported depth of 190 feet, while the middle half runs from 105 to 330 feet. Reported production has a 4.5 gpm median, but the available yield data is limited. Use these figures to compare neighboring wells, not to guarantee what a new hole will produce.
The area is plains terrain with alluvium and plains sedimentary rock. Most permits identify an unnamed or fractured-bedrock aquifer. That combination can make a driller's estimate useful, but nearby results still matter more than a countywide assumption.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Segundo. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 105 |
| Median | 190 |
| 75th percentile | 330 |
| 90th percentile | 569 |
| Deepest on record | 1,000 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 737 |
| Raton | 2 |
| Raton-Vermejo-Trinidad | 2 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 2.2 |
| Median | 4.5 |
| 75th percentile | 5.7 |
| Median depth to water | 160 ft |
| Median water level by decade | Depth to water |
|---|---|
| Not enough dated measurements | — |
Well depth around Segundo varies substantially. The median reported depth is 190 feet, and the middle half of wells falls between 105 and 330 feet. The 90th percentile reaches 569 feet, with the deepest record at 1,000 feet. The depth mix also shows why a single quote can be misleading: 22% are under 100 feet, 36% are 100-300 feet, 31% are 300-600 feet, and 11% are deeper than 600 feet.
For a drilling bid, ask what depth is included and what happens if the hole must go deeper. Alluvium and plains sedimentary rock may produce different drilling conditions from one parcel to the next. Neighboring permits near Segundo, Valdez, Cokedale, and Weston can help establish a realistic local range.
Among the wells reporting a pump yield, the median is 4.5 gallons per minute. The middle half is 2.2 to 5.7 gpm. The records show 54% producing between 1 and 5 gpm, 38% between 5 and 15 gpm, and 8% above 15 gpm. No reported wells fall under 1 gpm, but only 13 wells report a pump yield, so this is not a strong guarantee for an individual lot.
A 4.5 gpm well can be workable for ordinary household use when the storage system and pump are designed correctly. It is not the same as having that flow available directly from the formation at all times. Ask for the well test, recovery information, pump setting, and storage capacity before relying on a yield claim.
Reported static water levels have a median depth of 160 feet, with the middle half between 91 and 230 feet below ground. That tells you where water stood when the wells were measured, not necessarily the level during a dry season or the pressure available while pumping. Only 2 wells report a static water level, so the local picture is very limited.
The permit history does not provide enough water-level observations by decade to establish a dropping or stable water table. Do not treat the 160-foot median as a site-specific design depth. A driller should evaluate the parcel, nearby completion reports, expected drawdown, and the pump setting before final equipment is selected.
Colorado Division of Water Resources records show 744 permitted wells within 5 miles of Segundo, with 615 recorded as constructed. Permit activity is concentrated in the 2010s, which account for 560 permits. The records list 95 permits in the 1990s, 22 in the 2000s, and 4 in the 2020s. Earlier records include 5 in the 1950s, 5 in the 1970s, and 3 in the 1980s. The newest permit year is 2023.
Boday Well Drilling, listed as Boday, Alex, appears most often among named drillers, with 36 records. Authorized, listed as Pe, Pg, has 35, and Owner appears on 20. Treat permit listings as a research lead, then confirm current licensing, availability, and experience with your ground conditions.
The local cost model uses a typical drilling rate of $35 to $55 per foot for alluvium and plains sedimentary rock. At the 190-foot median depth, the drilled hole is estimated at about $6,600 to $10,400. That is not the complete project price.
A finished well with pump, pressure tank, trenching, and electrical is estimated at $12,600 to $22,400 at the median depth. A deeper-than-median hole, difficult access, extra casing or grout, longer utility runs, and difficult formation conditions can change the bid. Ask for a written separation between drilling, casing, grouting, pump equipment, electrical, trenching, testing, and permit-related work.
Low yield is the main practical concern even though no reported wells are under 1 gpm. The sample is small, and fractured-bedrock wells can be unpredictable. Dry holes and deeper-than-expected drilling are possible reasons to review multiple nearby completion reports before closing. Most permits identify an unnamed or fractured-bedrock aquifer; 737 wells use that description, while only 2 identify the Raton aquifer and 2 identify the Raton-Vermejo-Trinidad aquifer.
Water quality also deserves specific investigation. The mapped area includes 421 PFAS sampling or contamination sites and 93 historic mine features within about 10 miles. There are 0 EPA Superfund or cleanup sites. Test the existing well or a new source for appropriate contaminants, and locate septic components, reserve areas, driveways, and the building site so they do not conflict.
Before making an offer, obtain the DWR permit and completion information for the subject well and compare it with nearby wells in Segundo, Valdez, Cokedale, Weston, and Trinidad. Confirm the permitted use. The local records include domestic or household, stock, irrigation, and monitoring uses, and a permit's use category matters for a residence or future improvements.
For a vacant parcel, make the well investigation part of the feasibility work rather than waiting until construction starts. Confirm access for a drill rig, likely trench routes, electrical service, septic setbacks, and the intended building location. In Colorado, an exempt household-use well is still governed by its permit conditions and pumping limits. If the property is in an over-appropriated basin, ask whether an augmentation plan is required before relying on the water right.
| Decade permitted | Wells |
|---|---|
| 1950s | 5 |
| 1970s | 5 |
| 1980s | 3 |
| 1990s | 95 |
| 2000s | 22 |
| 2010s | 560 |
| 2020s | 4 |
| Most active drillers on record | Wells |
|---|---|
| Boday Well Drilling (Boday, Alex) | 36 |
| Authorized (Pe, Pg) | 35 |
| Owner | 20 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (330 ft) would run roughly $17,550–$30,150. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near SegundoTri-Lakes Contracting is a licensed Colorado contractor serving Segundo and the surrounding area with access driveways, site development, new-build septic systems, and custom homes. Their site planning can help coordinate the well, septic, utilities, and building work from the start.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Segundo can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Segundo. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median reported well depth within 5 miles of Segundo is 190 feet. The middle half runs from 105 to 330 feet, but the 90th percentile is 569 feet and the deepest record is 1,000 feet. Depth varies with the parcel and formation, so nearby completion reports should support any drilling estimate.
The local model uses $35 to $55 per foot. At the 190-foot median depth, the drilled hole is estimated at $6,600 to $10,400. A finished well with pump, tank, trenching, and electrical is estimated at $12,600 to $22,400. Deeper drilling, difficult access, and site-specific construction can raise the final bid.
Reported wells have a 4.5 gpm median yield, with the middle half from 2.2 to 5.7 gpm. The records show 54% between 1 and 5 gpm and 38% between 5 and 15 gpm. Only 13 wells report a pump yield, so request a well test and recovery information before assuming a new well will match these figures.
The records do not establish that every well is safe to drink. Within about 10 miles, there are 421 PFAS sampling or contamination sites and 93 historic mine features. Have the existing well tested by an appropriate laboratory, especially before purchase. A new well should also be tested after construction and disinfection before household use.
A well may support a house, but confirm the permit's authorized use, production, water quality, septic layout, and access before committing to construction. Local records include domestic, stock, irrigation, and monitoring permits. Compare the parcel with nearby wells, and ask about augmentation requirements if the property is in an over-appropriated basin.
All wells in Las Animas County — county-wide depth, yield and cost figures.
Driveway, septic, site development, feasibility or a custom build near Segundo.
Shopping a lot? Run the $99 instant buildability check →