Colorado Well Finder › Wells by county › El Paso County › Rush
Buying land or planning a home near Rush means understanding what nearby wells actually produce. In the Colorado Division of Water Resources records reviewed here, permitted wells within five miles of Rush commonly reach several hundred feet, with most reported yields falling between 5 and 15 gallons per minute.
The records include domestic, household, and stock wells, along with wells in fractured bedrock, Laramie Fox Hills, and Pierre Shale settings. These figures are useful for budgeting and comparison, but they do not guarantee what a new well will encounter on a particular lot. Check nearby well construction reports, water rights, septic locations, and current permit requirements before closing or starting site work.
Figures are computed from Colorado Division of Water Resources permit records for permitted wells within 5 miles of Rush. Not every permit reports every field; each statistic uses the wells that report it.
| Depth statistic | Feet |
|---|---|
| 25th percentile | 175 |
| Median | 280 |
| 75th percentile | 360 |
| 90th percentile | 475 |
| Deepest on record | 600 |
| Aquifer named on permits | Wells |
|---|---|
| unnamed / fractured-bedrock aquifer | 286 |
| Laramie Fox Hills | 53 |
| Pierre Shale | 48 |
| Yield statistic | gpm |
|---|---|
| 25th percentile | 9.2 |
| Median | 10.2 |
| 75th percentile | 12.0 |
| Median depth to water | 202 ft |
| Median water level by decade | Depth to water |
|---|---|
| 2010s | 165 ft |
| 2020s | 214 ft |
Rush wells have a median reported depth of 280 feet. The middle half runs from 175 to 360 feet, while the 90th percentile reaches 475 feet. That spread matters when you request a drilling bid: a lot with a 280-foot estimate should not be priced the same as one where nearby wells approach 475 feet.
Depth records are concentrated in the 100-to-300-foot and 300-to-600-foot ranges. The local permits identify 286 wells in unnamed or fractured-bedrock aquifers, with additional wells in Laramie Fox Hills and Pierre Shale. In this Denver Basin sedimentary-bedrock setting, drilling conditions can change across short distances. Neighboring well logs are the best first check, but a driller still has to price for uncertainty, casing, grout, and the final completion depth.
Among the 194 Rush-area wells that report a pump yield, the median is 10.2 gallons per minute. The middle half is 9.2 to 12.0 gallons per minute, and 79% fall between 5 and 15 gallons per minute. Another 14% report more than 15 gallons per minute.
No recorded wells in this set report less than 1 gallon per minute, while 7% report 1 to 5 gallons per minute. That is encouraging for household planning, but a pump test is still more useful than a countywide summary. Ask whether the reported figure is a short test or a sustained production rate, and confirm storage-tank sizing if the home, stock use, or irrigation demand will be significant.
The median static water level is 202 feet below the ground surface, with the middle half between 134 and 228 feet. That measurement is not the same as total well depth: a 280-foot well may have water substantially above its bottom, and pump placement must account for drawdown and recovery.
The decade medians show 165 feet below surface for measurements in the 2010s and 214 feet for measurements in the 2020s. That pattern suggests deeper measured water levels in the newer decade, but only 60 wells report static water levels, and the wells measured may not be the same wells or aquifers. Treat it as a reason to investigate, not proof of a uniform water-table decline across every Rush property.
The permit history shows steady activity over many decades, with the newest permit year in 2025. The records contain 439 permitted wells, including 323 recorded as constructed. Permit counts rose from earlier decades, reached 84 in the 1990s, and include 60 permits in the 2020s.
Kunau Drilling LLC, associated in the records with Timothy R. Kunau, is the most frequent listed driller with 122 wells. Hamacher Well Works Inc., associated with Alan Ray Hamacher, appears on 100. Kunau Drilling & Excavation, associated with Harvey Kunau, appears on 28. These names show local permit history, not a recommendation. For a new project, confirm licensing, insurance, references, construction methods, and who will handle the permit and pump installation.
For Rush ground identified as Denver Basin sedimentary bedrock, the drilling rate model is $50 to $70 per foot. At the 280-foot median depth, the drilled hole works out to about $14,000 to $19,600.
A finished well with pump, pressure tank, trenching, and electrical is modeled at about $20,000 to $31,600. That is a planning range, not a guaranteed bid. A deeper hole, difficult access, extra casing or grout, longer utility runs, a larger storage system, or unexpected formation conditions can move the final price. Ask each bidder to separate drilling, casing, grouting, pump equipment, electrical, trenching, testing, and permit-related work so proposals can be compared honestly.
Five PFAS sampling or contamination sites are mapped within about ten miles of Rush. That does not establish contamination at a particular well, but it is a reason to test existing water and review the location of any environmental site relative to the property. The records show no historic mine features and no EPA Superfund or cleanup sites within that mapped area.
Low-yield and dry-hole risk cannot be ruled out by a median. Confirm the well location, aquifer, construction report, pump test, and static water level before relying on a neighbor's result. Septic setbacks, driveway access, electrical routing, and building envelopes also need to be laid out together. Have the proposed septic system and well locations reviewed before excavation or a house plan is finalized.
Start with the DWR permit records for the lot and nearby parcels, then compare total depth, aquifer name, static water level, yield, and use. The local use mix is heavily domestic or household, with stock use also common, so confirm that the existing permit supports the use you intend. Irrigation is uncommon in this record set.
For a vacant lot, get a driller's site review before closing if the well location is uncertain. Budget using the local depth and cost ranges, but keep room for a deeper completion and site work. Colorado permits control what an exempt household-use well can do, including the 35-gallon-per-minute pumping limit, and over-appropriated basins may require an augmentation plan. Verify current rules with DWR and your water attorney.
| Decade permitted | Wells |
|---|---|
| 1950s | 3 |
| 1960s | 6 |
| 1970s | 26 |
| 1980s | 40 |
| 1990s | 84 |
| 2000s | 73 |
| 2010s | 49 |
| 2020s | 60 |
| Most active drillers on record | Wells |
|---|---|
| Kunau Drilling Llc (Kunau, Timothy R.) | 122 |
| Hamacher Well Works Inc (Hamacher, Alan Ray) | 100 |
| Kunau Drilling & Excavation (Kunau, Harvey) | 28 |
How this is built: the median permitted depth here times the per-foot range for this ground, plus the normal system costs. A lot at the 75th-percentile depth (360 ft) would run roughly $24,000–$37,200. See the full Colorado well cost guide.
Counts come from EPA, USGS and state datasets layered on the Colorado Well Finder map. A count is not a verdict on any one well; it tells you what to test for.
The numbers above are the area average. Your lot is one point on the map. Search the address to see the real depth, yield and aquifer of each permitted well around it.
Map wells near RushTri-Lakes Contracting is a licensed Colorado contractor serving projects around Rush, including access driveways, site development, new-build septic systems, and custom homes. Bring the well, septic, driveway, and building layout together before construction starts.
Licensed Colorado custom home builder · licensed driveway & excavation contractor · licensed septic installer
A listing photo can't tell you whether a lot is a dream or a money pit. Two parcels near Rush can carry the same asking price while one needs an $80,000 driveway and a $45,000 engineered septic the other doesn't. The well numbers on this page are the start of that answer. A Tri-Lakes Site Feasibility Report is the rest of it: a licensed general contractor, excavator and septic installer reads the parcel the way we would if we were about to build on it, and puts the real cost in writing before your money is committed.
Spend a little to know. Or gamble a lot to guess. Realtors sell the view and inspectors look at houses that already exist. We're the people who'd build it, so we catch what quietly turns a "great deal" into a budget disaster: bad access, buried rock, steep grade, soil that won't pass for a normal septic, water that's a fortune to reach. And if the lot is good, you've already got a builder ready to do the work, driveway to drywall.
Under contract, comparing parcels, or a realtor with a rural listing whose buyers keep asking "what will it cost to build here?" This is the due-diligence step almost everyone skips, and the one that saves the most.
Driveway, site work, septic or a build near Rush. Licensed GC, excavator and septic installer.
Got it. Tri-Lakes will get back to you shortly.
Something went wrong sending that. Email kyle@trilakes.co instead.
The median reported well depth near Rush is 280 feet. The middle half runs from 175 to 360 feet, and the 90th percentile is 475 feet. Records range as deep as 600 feet. Most wells fall in the 100-to-300-foot or 300-to-600-foot groups, so nearby construction reports are important when estimating a new well.
The local cost model uses $50 to $70 per foot. At the 280-foot median depth, drilling is estimated at $14,000 to $19,600. A finished well with a pump, tank, trenching, and electrical is estimated at $20,000 to $31,600. Actual bids can change with access, casing, formation conditions, and final depth.
Among 194 wells with reported pump yields, the median is 10.2 gallons per minute. The middle half produces 9.2 to 12.0 gallons per minute, and 79% report between 5 and 15 gallons per minute. No recorded wells report less than 1 gallon per minute, but a property-specific pump test remains essential.
The permit records do not establish that every Rush well is safe to drink. Five PFAS sampling or contamination sites are mapped within about ten miles, so test a prospective home's water and review nearby environmental information. Also test for routine household concerns through a qualified laboratory rather than relying only on the well permit or a neighbor's result.
Reported static water levels were deeper below the surface in the 2020s than in the 2010s: the decade medians were 214 feet and 165 feet, respectively. Only 60 wells report static water levels, and the measured wells or aquifers may differ. The pattern warrants investigation, but it does not prove a uniform decline across every Rush property.
All wells in El Paso County — county-wide depth, yield and cost figures.
Driveway, septic, site development, feasibility or a custom build near Rush.
Shopping a lot? Run the $99 instant buildability check →